Name: Stuart Arthur Garrett

Residence:

2/30 Vincent Street
Indooroopilly
Brisbane Qld Australia 4068
Postal
Address:

PO Box 1885
Milton
Brisbane Qld Australia 4064
Telephone
/facsimile:
Work: +61 (0) 7 3228 6996
Mobile/ Voicemail:
0418 70 96 70 (Preferred phone contact)
Residence: +61 (0) 7 3378 0302
Facsimile: +61 (0) 7 3343 7785

E-mail:
email@stuartgarrett.com

Website:
www.stuartgarrett.com

Date of Birth:

20 August 1971

Nationality:
Australian

Marital Status:

Single

Qualifications:

BE Mechanical (IIB Hons. 1993)
University of Queensland, Australia.

Registered Professional Engineer Queensland 
(RPEQ No 5713)

Continuing
Education:


MEngSc Construction and Engineering Management (Majoring in project management) (Sem 1 2000 ongoing) University of New South Wales

Queensland Workplace Health and Safety Officer (pending)

Professional
Memberships:

Graduate Member- Institution of Engineers Australia
(Member No 104454+) - (eligible for corporate membership)
Experience:

Six years experience in the mechanical engineering design, construction, precommissioning, commissioning and maintenance of multi-disciplined mining, materials handling and petro-chemical projects.

Continuing project engineering experience in the oil and gas industry.

July 2000 - Present

Santos Ltd
Queensland and Northen Territory Business Unit
Senior Project Engineer

Responsible for:

"Insert Text Here"


Top

July 1995 - June 2000
Ausenco Limited
Mechanical Engineer

Responsible for:

WMC Fertilizers Ltd
Queensland Fertilizer Project

Project Manager for the technical writing team; providing co-ordination, scheduling and technical direction for the development of standard engineering specifications and operating procedures for the site engineering group, during the commissioning and start-up phase of operations.

Site audit of contract deliverables for all LSTK contracts as part of the construction/practical completion phase of the project. Responsibilities included auditing the systems of the Project Management Consultant (Bechtel) and system contents to ensure that all contractual deliverables were handed over to the PCM prior to the award of practical completion and contract close and ensuring that the contents of deliverables were of a satisfactory quality to facilitate effective plant operations by the client. Audit also determined the conformance of LSTK contractors to Department of Mines and Energy requirements.

Normandy Pajingo Pty Ltd
Pajingo 70tph Expansion Project

Design engineer for the expansion of a gold ore treatment plant to increase tonnage throughput from 26tph to 70tph. Responsibilities included equipment specification, selection and procurement, intertank hydraulic analysis and P&ID development.

Flamemag International GIE
Flamemag Pilot Plant

Site troubleshooting of Autoclave discharge valve failure.

Wirrilie Gold Mines Ltd (Formerly Normandy Murchison Pty Ltd)
Big Bell Gold Mine
Preliminary Evaluation and Capital Cost estimate for stripping plant expansion.

Detailed site investigation followed by preparation of a ± 25% capital cost estimate for the expansion of an existing pressure Zadra stripping plant to allow processing of high grade silver ores. Capital cost estimation included earthworks, civil, structural and mechanical equipment items.

CSA Mines
Capital Estimate Proposal - Backfill Plant

Preparation of a ± 30% cost estimate proposal for the design and construction of a 40tph Cemented Hydraulic Fill plant to supply backfill material to an underground mining operation.

Peak Gold Mines Pty Ltd (Rio Tinto)
Debottlenecking evaluation.

Detailed site investigation for gold processing plant debottlenecking to expand plant capacity from 65tph to 85tph.

WMC Fertilizers Ltd
Gypsum Handling and Stacking System

Design engineer for a 354tph Gypsum Handling and Stacking system as part of the Queensland Fertilizer Project, Phosphate Hill, Qld. The Gypsum Handling and Stacking system was a hybrid dry transport/reslurrying/wet stacking system for the storage of gypsum waste product from the Phosphoric Acid Plant.

Responsibilities included mass balance and P&ID development, control philosophy, construction scope of works and development of commissioning and operating and maintenance manuals for the facility. Site role included precommissioning and trouble shooting of overland conveyor system.

ABB-Clough Joint Venture
Phosphoric Acid Plant Cooling Tower System

Design engineer for 5760m3/hr cross flow, induced draft, acid water cooling tower system as part of the Phosphoric Acid plant at WMC Fertilizers Ltd Phosphate Hill project. Responsible for the initial capital cost estimate proposal, mass balance and P&ID development, piping and valve design, HAZOP, liaison with international technology supplier, co-ordination with client and overall mechanical design responsibility within a multi-discipline design team.

Nords Australex Nominees Pty Ltd and Straits Mining Pty Ltd
Tritton Copper Project Bankable Feasibility Study

Preparation of a bankable feasibility study for 600,000tpa copper concentrate flotation treatment plant. Responsibilities included sizing and detailed technical specification of mechanical equipment including crushing circuit equipment, SAG mill, ball mill, flotation cells, vacuum disc filter, thickeners and all associated equipment for flotation circuits.

Preparation of a ± 30% feasibility study for 1.1Mtpa copper concentrate flotation treatment plant.

Southern Cross Resources
Honeymoon Uranium Project - Demonstration Plant
Recommissioning

Precommissioning and commissioning of firewater pump system for a 115tpa demonstration in-situ-leach solvent extraction/strip/precipitation uranium peroxide plant.

Allstate Explorations Ltd
Beaconsfield Mine Joint Venture
Stockpile Conveyor Project

Project Manager, design engineer and construction manager for a 200tph/1400mm wide belt conveyor, stockpile and haul road installation to haul ROM ore and mullock from the shaft hoist to a 1000 tonne stockpile and onwards to treatment plant. Responsible for all project, contracts, procurement, design, construction and commissioning activities.

Normandy Operations Pty Ltd (Pajingo Joint Venture Operations)
Pajingo Mill Expansion - Stage 1 Study

Detailed site investigation/audit, discussion with operation personnel and detailed review of plant equipment records followed by mechanical design review to identify plant bottle necks and determine potential for tonnage throughput upgrade for a 26tph gold ore treatment plant. Various upgrade tonnage throughputs were investigated from 26tph to 70tph, plant restrictions were identified for each case followed by recommendation of plant upgrade options to overcome bottlenecks.

WMC Fertilizers Ltd
Queensland Fertilizer Project Beneficiation Plant

Preparation of LSTK estimate proposal for 300tph phosphate rock crushing, washing, milling and slurry storage, beneficiation plant. Sizing and detailed technical and commercial specification of mechanical equipment including primary jaw and secondary cone crushers, vibrating and apron feeders, 3.2MW wet overflow ball mill, drum scrubber, screens, cyclones, thickeners, slurry pumps, agitators, belt conveyors, platework and other associated equipment.

Harrison Gray - Loss Adjustors and Consultants
Mt. Cuthbert Copper Project Aluminium Bus 
Bar Design Review

Independent review of design drawings, failure report and failure photographs of a failed 22,000 Amp aluminium bus bar system as part of a SX/EW copper plant. Detailed report and assessment of the suitability for purpose of the design and provision of comments as to the probable cause of failure. Specific investigation into bus bar design including material selection, joint design, jointing procedure and ampacity.

Rio Tinto
Research and Technology Development
Las Cruces Copper Project - Pilot Plant

Design Engineer for SX/EW copper pilot plant. Design of mixer settlers and hydraulic calculations to determine agitator performance criteria.

Tiomin Resources Inc.
Synthetic Rutile Plant Study Update

Prefeasibility study update for a synthetic rutile plant.

Queensland Magnesia (Operations) Pty Ltd
Deadburn Expansion Project - Stage 1

Project site engineer and design engineer for the design, and construction and commissioning of a 40,000tpa expansion of a calcined
magnesia processing plant.

Project site engineering responsibilities included ensuring contractor and vendor compliance with contracts and specifications, tendering and supervision of site related works, inspections and QA of contractor and vendor supplied equipment, expediting, liaison with client and provision of technical and project support to site engineering personnel.

Design responsibilities included design, specification and tendering of belt conveyors and specification and tendering of mechanical equipment including vibrating feeders, pumps, platework and bins.

Sardinia Gold Mines SpA
Furtei Gold Project, Sardinia

460,000tpa heap leach/CIL/flotation, gold and copper concentrate processing plant. Responsibilities included pipe sizing, pump and valve specification.

Cloncurry Mining Company NL
Great Australia Project

Construction, precommissioning and commissioning engineer for 5,500tpa heap leach SX/EW copper plant.

Pancontinental Resources (Base Metals) Pty Ltd
Lady Loretta Feasibility Study

Belt conveyor sizing, pump and pipe sizing, various equipment enquiries for bankable feasibility study for a 530,000tpa lead/zinc processing plant.

Boyne Smelters Limited
Maintenance Strategy Development - Spent Potlining Project

Development of pro-active maintenance strategies for the Calcine Treatment Plant as part of an aluminium smelter spent potline material treatment plant using RCM methodology.

Zeneca Specialties
SX/EW pilot plants

Cost estimation and ± 30% feasibility study for various solvent extraction plants for export. 

Top

Jan 1994 - June 1995

ICI Australia Operations Pty Ltd - Explosives Group
Mechanical Engineer

Operations mechanical engineer for a 110,000 tpa Ammonium Nitrate Plant.

Responsibilities included:

§ Design and implementation of plant modifications
§ Investigation and failure analysis of plant and equipment
§ Implementation of pro-active maintenance strategies
§ Shutdown planning
§ Implementation of capital projects
§ Development and implementation of daily maintenance planning
   systems and strategies
§ Commitment to improving and sustaining plant safety
§ Unsafe Acts Prevention officer
§ Provision of technical support to process and maintenance
   teams
§ Pressure vessel inspection
§ Hazard and Operability studies
§ Coordination of vibration analysis of rotating equipment
§ Coordination of oil analysis of rotating equipment
§ Coordination of laser alignment programs
§ Determination of mean time before failure of plant equipment
§ Specification and implementation of on-line condition
   monitoring systems
§ Reduction of fugitive emissions
§
Customisation of Safety, Health and Environment (SH&E)
   model procedures.

Top

Interests:

Project Library:
 
Touch football, swing dance, jazz

Available on request or by visiting website www.stuartgarrett.com

Top

References:
Ian Harmsworth Crispin (Cris) Kerrison 
Senior Mechanical Engineer
Alesa Alusuisse Engineering P/L
41 Bareena St
Jindalee
Brisbane Qld 4074
Ph: +61 (0)7 3376 0701
Fx: +61 (0)7 3279 6066
Email: n/a

Director/Senior Electrical Engineer
Paterson Flood Engineers Pty Ltd
31 Sherwood Rd
Toowong
Brisbane Qld 4066
Ph: +61 (0)7 3871 0533
Fx: +61 (0)7 3871 0538
Email: ckerrison@pfe.com.au


Kelvin Fiedler  Rolf Vollert 
Director/Principal Metallurgist
Minerals Processing Consultants
22 Emblem Ave
Jamboree Heights
Brisbane Qld 4074
Ph: 0419 37 67 55
Email: mpc@powerup.com.au
Director/Senior Mechanical Engineer
Austek Engineering (Qld) Pty Ltd
Level 7
544 Queen St
Brisbane Qld 4000
Ph: +61 (0)7 3230 9300
Fx: +61 (0)7 3230 9311
Email:rolf.vollert@austek.com.au  
         rjvollert@bigpond.com.au
Manfred Link 
Construction Manager
69 Dyer St
Pallarenda Qld 4810
Ph: +61 (0)7 4774 1496
Email: mjlink44@hotmail.com

Top


Stuart Garrrett Website | Intro | Curriculum Vitae | Project Library | Links | Contact

copyright :: stuart garrett©2000
website design :: AURUM3